The Manager's Notes
The purpose of this page is to inform homeowners of start up dates for various capital improvement programs, along with subsequent updates. Announcements regarding waterline repairs and shutoff dates and times for it will be posted. This is another means to notify homeowners of any other type emergency occurrence that may interrupt daily services. The scope of the project will entail the removal of several trees, most of the present landscaping, and sidewalks; re-grading of the soil to allow for a minimum of three inches of foundation exposure along the entire length of each building, reworking of current storm drain lines and installation of some new ones; and installation of new side walks and landscaping. Plans for starting the project is slated for late September and will require about six to eight weeks for completion. Removal of trees and shrubbery could start sooner. Trees scheduled for removal are located at 14361-14363 SM (2 large Ash) and at 14373 SM (1 large Oak). Root structure around these trees is elevated in such away that it will interfere with the soil removal needed to accomplish the desired drainage and the ultimate goal of this project. Homeowners that have special plants they have planted along with other potted plants, stands, and etc. may want to begin moving these items to their patios or carports. Larger plants to be saved will be tagged, removed and bedded in a corner of the courtyard until we are ready to replant them. Should you have further questions regarding this project, please do not hesitate to contact the office at 281-497-7840.
|

